Determining the volume of underground mine workings is essential for mineral extraction accounting, ventilation flow regulation, air distribution calculations, and effective isolation of mined-out areas and emergency zones (including those affected by underground fires). This process involves calculating the volume of rock mass required for work planning, cost estimation, and material consumption control, and is performed using the cross-section method.
The relevance of understanding the geometric characteristics of mine workings arises from several factors: the dynamics of the stress-strain state around the excavation directly influence its geometric shape and dimensions; optimization of the cross-sectional dimensions reduces the volume of excavation work and associated support costs; precise knowledge of geometry is necessary for predicting and monitoring high-pressure zones; and cost minimization is achieved through the elimination of re-supporting and improved ventilation efficiency.
The objectives of mine working volume estimation include: accurate quantification of extracted rock or mineral resources; verification of compliance with design parameters; calculation and optimisation of blasting operations; assessment of rock mass stability to ensure mining safety; enhancement of economic efficiency; and operational monitoring of the working's condition.
It is demonstrated that a significant reduction in the labour intensity of volume estimation for large-scale mine workings can be achieved by replacing the excavation surface with a set of endpoints of uniformly spaced vertical lines extending from the floor to the roof, measured using contactless methods.