Manufacturing and manufacturing industries

Vol. 1 No. 30 (2026) / 2026-03-30 / Number of views: 136

PROFIT FORECASTING FOR MINING DEPOSITS IN CAVING ZONES OF THE ZHEZKAZGAN FIELD BASED ON EMM

Authors

D.A. Kunaev Institute of Mining
https://orcid.org/0000-0001-6276-3474
National University of Science and Technology MISIS
https://orcid.org/0000-0002-1237-0979
LLC Soyuzgeomekh
https://orcid.org/0000-0001-8069-0037
D.A. Kunaev Institute of Mining
https://orcid.org/0000-0001-8283-898X
Kanysh Satpayev Kazakh National Research Technical University
https://orcid.org/0000-0003-0845-8449

Keywords

экономико-математическая модель, нетронутые залежи, математическое моделирование, система разработки, прибыль, зона обрушения, буро-доставочный штрек

Link to DOI:

https://doi.org/10.58805/kazutb.v.1.30-1515

How to quote

Bekbergenov D.К., et al. “PROFIT FORECASTING FOR MINING DEPOSITS IN CAVING ZONES OF THE ZHEZKAZGAN FIELD BASED ON EMM ”. Vestnik KazUTB, vol. 1, no. 30, Mar. 2026, doi:10.58805/kazutb.v.1.30-1515.

Abstract

The article addresses the strategic challenge of extracting untouched deposits at the Annenskaya mine (East Zhezkazgan Mine), which are located within caving zones characterized by active rock mass displacement Given the inefficiency of traditional geotechnologies, the use of a continuous mining system with caving and sublevel (end) ore drawing, reinforced with SVP-22 combined support, is justified.The scientific novelty of the research lies in the development and application of an economic-mathematical model (EMM) based on regression analysis with Lasso regularization. The use of a standardized profit equation allowed the authors for the first time to correctly compare heterogeneous factors (deposit geometry, production volumes, and quality indicators). The model revealed the non-linear nature of the impact of losses and dilution on the financial result and identified the role of tectonic shift as a modifier of profit sensitivity to changes in the dip angle. As a result of the study, critical dependencies were established: a family of concave curves (response surfaces) describing profit extrema was obtained. It is proved that with an increase in the dip angle beyond 30 degrees, the profitability zone narrows sharply, and maintaining an ultra-low level of losses becomes economically inexpedient due to the outstripping growth of operating costs. The technological limit of the method is set at a dip angle of up to 45 degrees. The practical significance of the work lies in the creation of a compact mathematical tool that allows determining break-even points and choosing optimal strategies for locating drilling-and-delivery drifts (DDD) under high uncertainty of a disturbed rock mass.