Economy, business and services

Vol. 2 No. 31 (2026) / 2026-06-30 / Number of views: 107

INTEGRATION OF PROJECT MANAGEMENT INTO THE STRATEGIC DEVELOPMENT OF ENERGY ENTERPRISES

Authors

S. Seifullin Kazakh Agrotechnical Research University
https://orcid.org/0000-0002-8551-0573
D. Serikbayev East Kazakhstan technical university
https://orcid.org/0000-0002-7411-3302
S. Seifullin Kazakh Agrotechnical Research University
https://orcid.org/0000-0003-2925-1631
Kazakh National Academy of Choreography
https://orcid.org/0000-0001-5414-135X
Korkyt Ata Kyzylorda University
https://orcid.org/0009-0002-4275-0937

Keywords

project management, strategic planning, energy enterprise, sustainable development, influencing factors, modernization, defects, objectives, resources, enterprise analysis

Link to DOI:

https://doi.org/10.58805/kazutb.v.2.31-1296

How to quote

Nurmukhametov , N.N., et al. “INTEGRATION OF PROJECT MANAGEMENT INTO THE STRATEGIC DEVELOPMENT OF ENERGY ENTERPRISES”. Vestnik KazUTB, vol. 2, no. 31, June 2026, doi:10.58805/kazutb.v.2.31-1296.

Abstract

In this article, the authors examine the application of project management in the strategic planning of energy industry enterprises. The main objective of the study is to analyze and calculate indicators to assess the efficiency of modernization of an energy enterprise. The object of the study is LLP “Ulba CHP”.

As a result of the research, various approaches to project management in strategic planning within the context of the digital economy have been systematized. The analysis revealed that strategic planning within project management constitutes a dynamic system consisting of six interconnected management processes, logically derived from one another. Each of these processes influences the others, forming a continuous feedback loop.

To determine the degree of decline in the enterprise’s operational efficiency, the chain substitution method was applied, which allowed calculating the impact of key factors. The results showed that the reduction in boiler unit operating time led to insufficient production of thermal energy.

The analysis also revealed that changes in the main factors – such as the operating duration of boiler units and heat losses in external pipelines – significantly affect the production process. Specifically, these changes impact boiler capacity, load levels, and the volume of useful thermal energy and hot water supplied to consumers. In this regard, the authors proposed a project for the modernization of the turbo-generator, aimed at improving enterprise efficiency and optimizing production indicators.