ANALYZING THE RESULTS OF THE PRELIMINARY FEASIBILITY STUDY FOR THE CONSTRUCTION OF A GAS PROCESSING PLANT AT FIELD X

Authors

K.Kulazhanov KazUTB
https://orcid.org/0000-0002-5959-4013
K.Kulazhanov KazUTB
https://orcid.org/0000-0002-6396-913X

Keywords

liquefied hydrocarbon gases, liquid hydrocarbons (LH), complex gas treatment unit, gas processing plant, WHP (wellhead pressure reduction), field development analysis, capital cost assessment

Link to DOI:

https://doi.org/10.58805/kazutb.v.3.28-1024

How to quote

Suleimen, Ye., and K. Satenov. “ANALYZING THE RESULTS OF THE PRELIMINARY FEASIBILITY STUDY FOR THE CONSTRUCTION OF A GAS PROCESSING PLANT AT FIELD X”. Vestnik KazUTB, vol. 3, no. 28, Sept. 2025, doi:10.58805/kazutb.v.3.28-1024.

Abstract

In the era of rapid development of “green” energy and transition to renewable energy sources, governments of many countries and major oil and gas corporations pay particular attention to forecasting global trends in hydrocarbon consumption by the world economy. This forecasting serves as a key guide in defining the strategy for their future development.

Natural gas plays a crucial role in the global energy sector and in international relations regarding the fuel balance.

The gas industry is a foundation of Kazakhstan’s economic and social prosperity. However, its effective development is constrained by several factors, including low investment attractiveness of projects to increase gas reserves, critical wear of gas transportation infrastructure, and a pricing system in the domestic market that does not meet the conditions for break-even gas supply.